

Your EV charger installed right, permit included.
Licensed Level 2 installation for Tesla, ChargePoint, and all major makes. We assess your panel, pull the permit, and have your charger live — often same week.
Three steps, no surprises.
Panel assessment on-site
Permit pulled, work booked
Charger live, inspection passed
We inspect your existing panel capacity, service entry, and garage run before quoting a single dollar. No guesswork, no hidden costs after the fact.
We handle the ESA permit before any wire is run. Most installs are booked within two business days — same week is standard across Oakville and the GTA.
Installation day is clean and fast. We test the full circuit, walk you through operation, and leave the job ESA-inspected and ready for your first charge.


Your panel and your EV, wired together properly.
Older homes often need a panel upgrade before a Level 2 circuit can be safely added. We assess both in one visit — no second contractor, no extra scheduling.
ESA-licensed technicians. Permit-pulled on every job. All major charger brands supported — Tesla Wall Connector, ChargePoint, Wallbox, and more.
Book your EV charger install today.
Same-day or next-day availability across Oakville, Burlington, Mississauga, and the GTA. Free estimate, no commitment.




